On May 20-21, 2025, the "Evaluation of the Highest Quality Level of Municipal Engineering" review team of the China Municipal Engineering Association, accompanied by Zhao Xisheng, Vice President of the Jiangsu Municipal Engineering Association and President of the Changzhou Municipal Engineering Association, conducted a review of the highest quality level evaluation of the municipal general contracting project of the first phase of the Wunan Second Sewage Treatment Plant in Wujin District, Changzhou City. Cao Weisong, General Manager of the Group Company, Li Zhongjun, Deputy General Manager and Chief Engineer, Wang Weiming, Deputy General Manager, project team members, and five responsible parties attended the review meeting.
Changzhou Wunan No.2 Sewage Treatment Plant Phase I Project, as a national and provincial key project of water pollution prevention and control in the the Taihu Lake Lake basin, is the key support for Changzhou to promote the protection of the Taihu Lake Lake and fight the battle of water pollution prevention and control. The project has a scale of 100000 m ³/d and a total investment of 600 million yuan. The construction project mainly includes the construction of new hydraulic structures, buildings, electrical equipment installation, plant process pipelines, rainwater and sewage pipelines and roads, external water inlet and outlet pipes, plant greening and wetland engineering, etc.
The 14th review group, composed of senior technical experts, quality management experts, and scholars in related fields, conducts a review of key aspects such as project engineering design, construction process, quality control, technological innovation, safety and environmental protection with rich professional knowledge and practical experience, aiming to evaluate whether the project meets the highest quality standards of the China Municipal Engineering Association.
This review not only provided a platform for quality management experience exchange among participating units, but also played a significant role in further strengthening engineering control and improving construction level for our company. Our company will take this review as an opportunity to continuously optimize construction management and create more high-quality projects with ingenuity.
|